October 20, 2023 | Westcliffe, CO

We were able to provide a full reconstruction/remodel for her hotel lobby and a living space. She was also able to collect additional funds from insurance from the estimate provided by KW.

October 19, 2023 | Nathrop, CO

Repaired the property to pre-loss condition.

September 25, 2023 | Salida, CO

Repaired the damage in an old Victorian home.

September 14, 2023 | Salida, CO

We caulked the roof and tore out drywall. Then replaced the drywall and textured and painted.

August 25, 2023 | Salida, CO

Clean debris, hepa vac, fill holes and apply anti-microbial

May 26, 2023 | Fairplay, CO

They needed flooring and drywall repaired as well as mitigation for the water damage as well.

March 21, 2023 | Keystone, CO

dried out affected areas, mitigation, then reconstruction to get the home back to the previous condition.

March 1, 2023 | Keystone, CO

Dried out each unit affected and replace drywall, carpet and damaged tile.

October 17, 2022 | Copper Mountain, CO

We dried and cleaned the water damage and removed the destroyed materials, replaced and repaired flooring and damages, mitigated mold as well.

July 20, 2022 | Colorado Springs, CO

We gave an estimate and then had crews do all the necessary work to complete the job as if nothing ever happened.

September 1, 2021 | Blue River, CO

Repair soffet and dry out interior, repair soffet and seal.

Gramling

July 1, 2020 | Buena Vista, CO

We provided high end, and custom-built finishes including granite walls in the bedrooms, custom lighting in the bathrooms and customized game room.This house has open floor plan with large windows allowing for plenty of natural light. There is a large glass wall with sliding glass doors that open out ...

GW Development - Westwoods Subdivision Model Home

June 30, 2020 | Leadville, CO

GW Development is nearly finished with the Woodwoods Subdivision model home. The model home is 2,092 sq ft featuring two levels with 3 bedrooms, 3 bathrooms, a finished basement, upper and lower decks and detached two car garage. To view the 3D floor plan, Click Here!

April 22, 2020 | Wildernest, CO

Dried out affected areas and cleaned up the mess, fixed and replaced damaged drywall, floors, and pipes.

Colorado Mountain College

February 19, 2020 | Leadville, CO

KW Construction and Restoration's professionals reconstructed the library at Colorado Mountain College Leadville Campus with new flooring, painting, lighting and installation of new murals.